Angers

A 12 km tramway line is under construction. Two sections in the centres of Angers and Avrillé will be built with ground-level power supply (Alimentation par Sol) like in Bordeaux.

Projects

A Avrillé Ardenne - La Roseraie (2010)

Rolling Stock

17 Citadis 302, delivered as from 2009

Links

http://tramway.angersloiremetropole.fr/

© http://www.trams-in-france.net by Christoph Groneck